Construction Bids/SOQs

Please click here to view the MSCAA Master Plan.

SOQs


Construction

Bid Name Date Issued Bid Opening Download
BID: Airside Electrical Vaults 1-4 Seismic Retrofit – Construction
Bid No.: 13-1360-01
08/12/2014 09/11/2014
2:00 PM
Local Time
See below
ADDENDUM 1:
Please click here to download Addendum 1.
Please click here to download Section 00320 – Geotechnical Data.
Please click here to download the Geotechnical Report.
MANDATORY MEETING:
A MANDATORY Pre-Bid Meeting was held Thursday, August 21, 2014 at 2:00 PM Local Time at the Airport Project Center, 4225 Airways Boulevard, Memphis, TN 38116. Only Prime Contractors who attended the Pre-Bid Meeting will be permitted to submit a Bid.

SIGN-IN SHEETS:
Please click here to download the Sign-In Sheets.

PRE-BID AGENDA:
Please click here to download the Pre-Bid Agenda.
BID DOCUMENTS:
Please click here to download the Proposal Package.
Please click here to download the Specifications.
Please click here to download the Drawings.
LEGAL NOTICE:
Please click here to download the Legal Notice.


SMALL BUSINESS PROGRAM (“SBP”) PROJECTS
PLEASE CLICK HERE FOR INFORMATION ON MSCAA’S
SMALL BUSINESS PROGRAM

Future Projects

Concourse Modernization Program
Please visit http://www.flymemphis.com for program information. Project is currently in planning.

De-Ice Pad(s)
Project includes design and construction of deice pad(s) for winter operations. May include a cross-field southern connector for improved taxi operations and a bridge or tunnel structure for Louis Carruthers Drive, if required. Project is currently in planning. Estimate Date of Design: T.B.D. Estimated Date of Construction: T.B.D. . Click here for sketch.

De-Ice Glycol Controls
Project includes facilities to collect, convey, and either treat or export glycol-based pollutant from deicing fluids. Project is currently in planning. Estimated Date of Design: T.B.D. Estimated Date of Construction: T.B.D. Click here for sketch.

Plough Cargo Ramp
Project includes design and construction of a new cargo ramp. Includes, but is not limited to, the following disciplines: civil, electrical, and fueling. Project is currently in design. Estimated Date of Construction: T.B.D. Click here for sketch.

Perimeter Fence Intrusion Detection System
Project includes addition of an intrusion detection system to the exterior fence. Project is currently in planning. Estimated Date of Construction: 2015.

CONRAC Maintenance Facility – Design
Project includes construction of a consolidated rental car (CONRAC) maintenance facility to include an office building, storage facilities, vehicle maintenance bays, and vehicle parking areas. Project is currently in planning. Estimated Date of Design: 2015. Estimated Date of Construction: 2015.

Charles Baker Airport – Hangar Renovations
Project includes replacement of metal siding, metal roofing, trim, doors, and incidentals for four hangars. Project is currently in design. Estimated Date of Construction: 2015. Click here for sketch.

Charles Baker Airport – Terminal Building Replacement
Project includes demolition and replacement of the existing terminal facility as well as overlay and expansion of the existing parking lot. Project is currently in design. Estimated Date of Construction: T.B.D. Click here for sketch.

General DeWitt Spain Airport – Airfield Improvements
Project includes runway extension, taxiway relocation, airfield lighting systems replacement, and levee relocation. Project is currently in design. Estimated Date of Construction: T.B.D. Click here for sketch.

General DeWitt Spain Airport – New Hangar
Project includes construction of a new common-use hangar. Project is currently in design. Estimated Date of Construction: 2015.

Hurricane Creek Taxiway Crossing
Project includes a reinforced concrete box culvert across Hurricane Creek designed to support aircraft loading for a taxiway crossing of the creek. Project design is complete. Estimated Date of Construction: T.B.D. Click here for sketch.