Construction Bids/SOQs


Construction


Bid Name Date Issued Bid Opening Download
BID: Perimeter Fence Intrusion Detection System
BID NO: 14-1375-01
07/07/2015 07/14/2015
5:00 PM Local Time
See below
BID PACKAGE:
A complete Bid Package will be available on or after July 17, 2015 to those companies that meet the Pre-Qualification Checklist.

To see which firms were shortlisted, please click here to download the list.
PRE-QUALIFICATION CHECKLIST:
Please click here to download the Pre-Qualification Checklist.

The Pre-Qualification Checklist is due 07/14/2015 5:00 PM Local Time via USPS to:
Memphis-Shelby County Airport Authority
ATTN: Development
2492 Winchester Road
Suite 113
Memphis, TN 38118
LEGAL NOTICE:
Please click here to download the Legal Notice.

PLEASE CLICK HERE FOR INFORMATION ON AIP BUY
AMERICAN PERFERENCE REQUIREMENTS.



SMALL BUSINESS PROGRAM (“SBP”) PROJECTS
PLEASE CLICK HERE FOR INFORMATION ON MSCAA’S
SMALL BUSINESS PROGRAM

Future Projects

Concourse Modernization Program
Please visit http://www.flymemphis.com for program information. Project is currently in design.

Airline Ops Offices, Ticket Counter Offices, and Baggage Office Renovations
Project includes design and construction of renovations to airline lease areas for operations, ticket counters, and baggage offices. Includes architectural improvements and MEP modifications. Project is currently in design. Estimated Date of Construction: 2015.

Concourse "B" Substation Additions
Project includes relocation of one existing substation and installation of two new substations. Also includes MV system improvements and building renovations to accommodate the additional substations. Project is currently in design. Estimated Date of Construction: 2015.

Commercial Drive Entrance Drainage Improvements
Project includes reconstruction of the commercial drive entrance lanes in order to repair leaking utilities below grade. Project is currently in design. Estimated Date of Construction: 2015.

De-Ice Pad(s)
Project includes design and construction of deice pad(s) for winter operations. May include a cross-field southern connector for improved taxi operations and a bridge or tunnel structure for Louis Carruthers Drive, if required. Project is currently in design. Estimated Date of Construction: 2016. Click here for sketch.

De-Ice Glycol Controls
Project includes facilities to collect, convey, and either treat or export glycol-based pollutant from deicing fluids. Project is currently in planning. Estimated Date of Design: T.B.D. Estimated Date of Construction: T.B.D. Click here for sketch.

CONRAC Maintenance Facility
Project includes construction of a consolidated rental car (CONRAC) maintenance facility to include office buildings, storage facilities, vehicle wash and refueling stations, vehicle maintenance bays, and vehicle parking areas. Project is currently in design. Estimated Date of Construction: 2016.

Airfield Maintenance & Warehouse Facility
Project includes replacement of the airport’s existing facilities. The facilities will include office areas, meeting rooms, storage areas, a break room with commercial kitchen, warehouse space, bunk rooms, restrooms, vehicle maintenance bays, wash bays, paint booth, paint storage, tire storage, electrical shop, sign shop, fueling island, glycol storage and covered equipment storage. Project is currently in design. Estimated Date of Construction: 2016.

Charles Baker Airport – Hangar Renovations
Project includes replacement of metal siding, metal roofing, trim, doors, and incidentals for four hangars. Project is currently in design. Estimated Date of Construction: 2015. Click here for sketch.

Charles Baker Airport – Terminal Building Replacement
Project includes demolition and replacement of the existing terminal facility as well as overlay and expansion of the existing parking lot. Project is currently in design. Estimated Date of Construction: T.B.D. Click here for sketch.

General DeWitt Spain Airport – Airfield Improvements
Project includes runway extension, taxiway relocation, airfield lighting systems replacement, and levee relocation. Project is currently in design. Estimated Date of Construction: T.B.D. Click here for sketch.

Hurricane Creek Taxiway Crossing
Project includes a reinforced concrete box culvert across Hurricane Creek designed to support aircraft loading for a taxiway crossing of the creek. Project design is complete. Estimated Date of Construction: T.B.D. Click here for sketch.

Passenger Boarding Bridge Improvements
Project includes refurbishment, point-of-use equipment acquisition, and other improvements to existing passenger boarding bridges. Project is currently in planning. Estimated Date of Design: 2015. Estimated Date of Construction: 2015.